건원엔지니어링

PM

PROJECT MANAGEMENT(pCM+CM)

We offer optimally integrated management solutions to maximize business feasibility

It started with the Seoul World Cup Stadium project, where we introduced the first PM in Korea and presented the best strategy for project implementation based on specialized technical skills and networks within each field of project development. To contribute to the success of your construction projects, we have developed an internal system that supports integrated management in all areas of construction.

TP TOWER

TP TOWER

Heavy ion accelerator Research Institute RAON

The largest single research facility ever constructed. World-class beam energy & beam output.

Heavy ion accelerator  Research Institute RAON

Dongdaemun Design Plaza DDP

Introduction of BIM for the construction of 45,133 unstructured exterior panels. Seoul's first barrier-free and eco-friendly building.

Dongdaemun Design Plaza DDP

Yongsan US military base relocation project

Established a technical cooperation system between Korea and the United States.

Yongsan US military base relocation project

Naver Data Center GAK Chuncheon

The highest standard index of energy efficiency (PUE) at home and abroad

Naver Data Center GAK Chuncheon

Incheon International Airport Phase II∙III

Obtained KOSHA 18001 certification for the implementation of construction safety systems.

Incheon International Airport Phase II∙III

Knowledge sharing system

A step-by-step technical system is implemented by the top experts from each field to manage the project. Kunwon Engineering's specialized systems support professional project management and expand opportunities for mutual technology exchange and information sharing, thereby increasing the likelihood of project success.

KPMS

  • A real-time exchange of business status information between headquarters and field offices (on-site)
  • Implementation of a decision-making function within the project
KPMS

Kunwon Engineering PMIS System

KITS

  • Create a database of 1,000,000 technical records.
  • Shared technical knowledge across 14 fields of work.
KITS

Integrated knowledge management system

K-navi

  • Assists in the development of step-by-step CM work manuals, cases, reports, laws, forms, and standard guidelines.
K-navi

Business/Project Management Process Map C-2016-020725

K-BPC

  • Being responsive to the client's needs in a timely manner
  • Share achievements across sites to pursue proactive business management
K-BPC

Find and share living solutions

Step-by-step work

PM step-by-step work

pCM service

All matters related to the cost, timetable, and quality of the project are verified before construction can begin. The PreCon Service allows us to prepare in advance to handle problems such as unclear information, additional cost requests, and delays during construction, which are the biggest concerns of a business owner.

PM step-by-step work

CM service

We provide a variety of technical support and construction supervision activities for all our construction projects. At each stage of the construction process, we ensure the highest level of quality within the allocated budget and schedule, including careful management of quality, cost, process, and safety.

DB-based element technology system

VE Integrated System III

  • Accumulation of more than 8,000 VE cases and database
  • VE proposal search, scientific analysis tools installed
VE Integrated System III

Construction Value Engineering Management System Patent No. 10-1077039

KWDR

  • Enhancing the completeness of the design and managing changes to the design
  • Composition of 3-step design review process for each level
KWDR

Design review program C-2018-024539