• 사업분야/실적
  • 사업분야
  • 컨설팅(Consulting)

VE, LCC 소개

Value Engineering

Kunwon Engineering performs VE by proper allocation of three objectives of project in the basic designing, application and construction stage- time, cost and quality to achieve the goal of quality improvement of the project and cost reduction. We also consider new technology and materials to provide the best economical solution, and examine various point of view to find effective solutions for each stage. Kunwon Engineering VE teams are composed of specialized experts, and VE leaders of each project adjust the role of members to operate specialized knowledge effectively.

Life Cycle Cost

Building or facilities are separated into initial cost and maintenance-management-exchange cost after construction, and those expenses are called as life cycle cost. In a long point of view, management cost is higher than initial cost (60~70%). So Kunwon Engineering provides effective finishing materials and system to the owner to minimize management cost and overall life cycle cost. This effort reduces business cost, supports owner’s decision, improves construction ability, reduces maintenance cost, expands efficiency and convenience of the bulding, and ultimately increases the profit of the owner.