  • 건설사업관리(CM)

We will lead the project into success by putting spirit and passion with owner’s mind

Kunwon Engineering’s CM provides integrated management techniques to the planning, feasibility analysis, designer selection, designer management, construction cost and schedule management, procurement, construction and operation and management. From inception to completion, for the purpose of enhancing design and construction quality within owner’s cost limitation, and since a professional technology institute controls designer and constructor throughout the whole stage, it will produce an optimized building in terms of cost, quality and time and maximizes owner’s asset value.

While a construction supervision handles inspection work which is related to safety and quality around the construction stage, CM is an advanced construction service that participants as the representative of the owner in the planning and feasibility analysis stage, which determines 70~80% the project construction cost, and proceeds whole stage of the project such as business cost, schedule, quality, contract, safety control so on consistently.

  • Insufficient techniques/Technical skills
  • Insufficient experience
  • Project which require consistent management
  • Complicated, large-scale projects
  • Projects which require a high level of technical experties
  • Emergent projects



  • Business typeService provider
  • RoleRepresentative of the owner
  • Management objectsefficiency improvernent of cost, schedule, quality and contract
  • Manage & Lead, PlanManagement point: Focused on manage & lead, plan and process
  • Participation pointNeeds to act together with CMr from the business planning phase
    for greatest result Most effective when involved from the initial phase with CMr

  • Project management

    • Project coordination and control
    • Identify construction related problems and suggest alternatives
    • develop a project organization and job plan
    • Manage regular and special meetings
    • Establish and operate PMIS
  • Cost management

    • Establish budget and analyze alternative cost
    • Estimate and review project cost
    • Value Engineering
    • cost monitoring
    • coordinate and control cost
  • Schedule management

    • Establish and maintain construction schedule
    • Examine contractor’s schedule and check construction progress
    • Review recovery plans and modify schedule
    • Review impact of extended duration and design change on progress
  • Quality assurance

    • QA activities
    • Control progress of schematic design/design development/construction development
    • Review design document control interface, evaluated constructability, specification and construct ability. Manage the interface
    • Construction supervision
    • Quality coordination and control
  • Business and contract administration

    • Support bidding preparation and process
    • Help review and screen bid document
    • Progress and completion inspection
    • Resolve claims and other conflicts
  • Safety and environment management

    • Examine Appropriateness of the safety control plan and monitor its actual application
    • Conduct regular and precise safety inspection
    • Examine environment management plan and monitor its actual application
    • Monitor environment and examine environment related documents

  • Develop cost saving method
  • Prevent cost increase in design and construction
  • Reduce business expenses in the view of value engineering
  • Analysis and control cost for design main taining compliance with the budget based on the design

  • Simultaneous progress in design / construction (Fast Track)
  • Timely support major decision making for earlier commencement and smooth progress
  • Predict and develop countermeasures against delay factors, such as design change, claim, etc
  • Throughout th project, Manage weekly/monthly progress meetings and monitor schedule compliance.

  • We track and control every problem related to quality until completely resolved.
  • Prevent excessive or underrate design by review of design document
  • Operate quality assurance program based on 28 years of experience, accumulated knowledge and know-how./li>
  • Implement preliminary inspection & prevention, precise confirmation and responsible duty system to improve quality